Initial Start-Up - Siemens SIMOVERT MASTERDRIVES 6SE7087-6CX86-2BA1 Manual

Active front end (afe) afe rectifier / regenerative feedback unit ac-dc modular design for construction types e to j
Table of Contents

Advertisement

01.2004
3

Initial Start-Up

Unpack and check the
units
Fit the main
components of the unit
and install options that
have not already been
fitted
Wire the main
components of the unit
and connect the PE
conductor and the
power cables
Form the DC link
capacitors, if necessary
Connect the 230 V AC
auxiliary voltage or the
24 V DC and the mains
voltage
If necessary, carry out
parameter reset to
factory setting
Siemens AG
6SE7087-6CX86-2BA1
SIMOVERT MASTERDRIVES AFE
After removing the packaging, check that the unit is
intact and undamaged. Only intact units may be started
up. Please also check that all the necessary option
boards are present and correct.
Retrofit any optional boards which have not yet been
installed, if necessary. Then install the units taking into
account the requirements at the point of installation and
the EMC instructions.
Beginning with the PE conductor, connect the power
cables and the power wiring of the AFE chokes. It is
advisable to not yet connect the DC link module.
Use only the included cable harnesses for further
internal wiring of the main conponents. In this step, do
not yet connect the control and communication cables.
Exception: OP1S if the unit is to be parametrized via
OP1S.
If the unit's DC link was de-energized for more than a
year, the DC link capacitors must be formed again. .
Note: under no circumstances must the main contactor
-K1 and the precharging contactor -K4 be connected in
this phase; therefore, check the unit before connecting
the mains voltage.
After checking the cabling for correct connection and
secure attachment, connect the mains voltage or the
auxiliary power supply. After the electronics power
supply has been started, the unit initializes itself. The
action can take several seconds. The drive status is
subsequently shown on the PMU.
If the PMU does not show status °009 after completion
of the unit initialization, or if the unit has already been
parameterized before, you should carry out a parameter
reset to factory setting.
Operating Instructions
Initial Start-Up
See section
"Transport,
Storage,
Unpacking"
See section
"Installation"
and "Installation
in Conformance
with EMC
Regulations"
See chapters
"Connecting and
wiring" and
"Installation in
conformance
with EMC
Regulations"
See section
"Forming"
See chapter
entitled "Basic
111
function check"
See section
"Parameterization"
3-1

Advertisement

Table of Contents
loading

Table of Contents