Water Connections - Riello RBC-HP 1S Series Installation, Operation And Maintenance Manual

Table of Contents

Advertisement

Available languages

Available languages

INSTALLATION

WATER CONNECTIONS

11 WATER CONNECTIONS
AD
Psr
RE
DESCRIPTION
Psr
Diameter/length of solar controller sensor socket
RE
Sleeve for electric heating element (not supplied)
DF
Flange internal diameter
UAC
Domestic hot water outlet
AD
Quantity/diameter/length of magnesium anode
RL
DHW recirculation
MC
Boiler/heat pump delivery
Psc
Internal diameter/length of boiler/heat pump sensor drain
RC
Boiler/heat pump return
EAF
Domestic cold water inlet
A
B
C
D
E
F
G
H
I
L
M (*)
N
O
(*)
The fitting (M) can be used as an alternative for inserting the first magnesium anode (for installation rooms that are not
particularly high).
9
We recommend that you install isolating valves in the outlet and return lines.
9
Check the efficiency of the seals when filling/refilling the storage cylinder.
9
In case of a probe, any electric junction between probe cable and extensions for the connection to the electric panel must be
soldered and protected with a sheath or a suitable electric insulation.
9
Install the magnesium anode supplied (for the models 800 and 1000).
RBC-HP 150-500 1S
UAC
RL
MC
Psc
DF
RC
EAF
I
H
RBC-HP 800-1000 1S
Psr
RE
DF
I
H
RBC-HP 1S
150
200
300
1" Gas M
1/33/300 1/33/450 1/40/480 1/40/600 1/40/600 1/40/750 mm
1" Gas M
171
174
174
243
246
256
588
673
928
753
956
1041
836
1056
1141
920
1173
1673
1088
1338
1838
626
630
634
604
604
604
363
366
369
578
663
918
813
1066
1566
-
-
-
16
UAC
AD
RL
MC
Psc
RC
EAF
500
800
1000
16/180
1" 1/2 F
130
1 " 1/4 Gas M
1" Gas M
1" Gas M
16/180
1" Gas M
1 " 1/4 Gas M
207
75
75
303
289
289
898
884
1047
1113
1089
1179
1213
1189
1279
1589
1294
1379
1793
1706
2032
786
1831
2156
755
1035
1040
413
414
414
888
876
1037
1468
1440
1764
-
970
973
mm
Ø
mm
Ø
Ø
Ø
mm
Ø
Ø
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm

Advertisement

Table of Contents
loading

Table of Contents