Lifting Procedure

In the process of shipping and maintaince, if the control panel need to be disassembly, the rec-
ommended lifting method as follows:
Figure 10. Recommended Lifting Method
Equipment Damage!
Never use a forklift to move the unit. The skid is not designed to support the unit at any one
point and using a forklift to move the equipment may cause unit damage. Always position the
lifting beam so that cables do not contact the unit. Failure to do so may result in unit damage.
Note: If absolutely necessary, the chiller can be pushed or pulled across a smooth surface if it is
Shipping Mounts!
Do not use the threaded holes in the compressor to lift or assist in lifting the unit. They are not
intended for that purpose and could create a dangerous situation. Do not remove the wood
mounts until the unit is in its final location. Removal of wood shipping mounts prior to unit
final locating could result in death or serious injury or equipment damage.
1. When the unit is at its final location, remove the shipping bolts that secure the unit to the
2. Rig the unit properly and lift from above or jack the unit (alternate moving method). Use the
3. Install clevis connectors in lifting holes provided on the unit. Attach lifting chains or cables to
RTHD-SVX04K-EN
bolted to wood shipping mounts.
wood base mounts.
points shown on the rigging diagram that ships with the unit as shown in
the base mounts.
clevis connectors as shown in
chiller.
LIFTING POINT
45°MIN
D CAUTION
D WARNING
Figure
11. Each cable alone must be strong enough to lift the
Installation Mechanical
Figure
11. Remove
37

Advertisement

Table of Contents
loading

Table of Contents