Filter Shipment

Filter is shipped separately fixed on wooden box. Wirings for filter shipping will be in same pack-
age of filter. And installation guide file enclosed the box.

Filter Installation on Site

Mechanical Assembly

Step 1. Check all accessories according to the enclosed list.
Step 2. Confirm two U supports are fixed on brackets welded on the condenser with bolts. (See
Figure
Step 3. Lift filter panel by top four eyebolts (Refer to Filter Panel Lifting).
Step 4. Fix filter panel to the U supports by six bolts. Mount bolts from U support side into the
filter panel directly. (See
Step 5. Install the cable guider on the oil sump by a pair of clamp with 8 bolts. (See
RTHD-SVX04K-EN
22)
Figure
1446 mm
22)
Filter
Figure
22)