Lifting Procedure - Trane Optimus RTHD Installation, Operation And Maintenance Manual

Water-cooled chillers
Table of Contents

Advertisement

Installation Mechanical

Lifting Procedure

Figure 7.
Rigging configuration
F (min)
Condenser
Evaporator
(a) Optional AFD is not shown. See
Table 7.
Rigging dimensions
Unit
(a)
Configuration
Units
B1B1B1
in
mm
B1C1D1
in
mm
B2B2B2
in
mm
B2C2D2
in
mm
C1D5E4
in
mm
C1D6E5
in
mm
C1E1F1
in
mm
C2D3E3
in
mm
C2D4E4
in
mm
C2F2F3
in
mm
D1D1E1
in
mm
D1F1F2
in
mm
D1G1G1
in
22
(a)
E
Anti-rolling
Cable
Lifting
Holes
44.5mm dia typ
Figure 3, p. 9
for location of optional AFD. Rigging information is same for wye-delta or AFD units.
A
120
3048
144
3658
120
3048
144
3658
120
3048
120
3048
144
3658
120
3048
120
3048
144
3658
120
3048
144
3658
144
A
B
D
C
Eyelet or M16
Anti-rolling
Internal Thread
Cable
Starter
Unit Model Number Location
Dimension - in (mm)
B
C
108
56.97
2743
1447
132
58.23
3353
1479
108
58.11
2743
1476
132
58.31
3353
1481
108
59.96
2743
1523
108
60
2743
1524
132
63.50
3353
1613
108
59.72
2743
1517
108
59.96
2743
1523
132
63.4
3353
1610
108
60
2743
1524
132
63.46
3353
1612
132
63.46
Controls
D
E
3.92
21.02
97
534
3.74
20.51
95
521
3.86
21.06
98
535
3.66
20.59
93
523
8.62
22.99
219
584
8.58
22.91
218
582
5.08
24.57
129
624
8.86
24.33
225
618
8.62
22.99
219
584
3.98
24.29
101
617
7.36
24.09
187
612
3.9
24.49
99
622
3.9
25.75
F
24
610
24
610
24
610
24
610
24
610
24
610
24
610
24
610
24
610
24
610
24
610
24
610
24
RTHD-SVX01K-EN