ESiEN09-06 A
Detailed Setting Procedure of Low Noise Operation and Demand Control
1. Setting mode 1 (H1P off)
2. Setting mode 2 (H1P on)
Test Operation
In setting mode 2, push the BS1 (MODE button) one time.
H1P lights.
During the setting mode 1 is displayed, "In low noise operation" and "In demand control" are
displayed.
In setting 1, push and hold the BS1 (MODE button) for more than 5 seconds.
mode 2 is entered and H1P lights.
Push the BS2 (SET button) several times and match the LED display with the Setting No.
you want.
Push the BS3 (RETURN button) one time, and the present setting content is displayed.
Push the BS2 (SET button) several times and match the LED display with the setting
content (as shown below) you want.
Push the BS3 (RETURN button) two times.
Push the BS1 (MODE button) one time.
Setting mode 2 is entered and
Returns to
.
Returns to the setting mode 1 and turns H1P off.
Field Setting
Setting
141