NOTE:
• For check operation, the following work will be performed.
• It takes about 40 minutes to complete the check operation.
[Check Operation Procedure]
STEP1 Make the onsite setting as needed using the dip switches on the outdoor unit PC-board
STEP2 Close the EL. COMPO. BOX lid and all front panels except as the side of the EL.
STEP3 Check the LED display on the outdoor unit PC-board (A1P) is as shown in the table
LED display
(Default status of shipped)
LED display: ...OFF,
STEP4 Make the onsite settings as needed using the push button (BS1-BS5) on the outdoor
STEP5 Perform the check operation following the Check Operation Method of the [Service
Test Operation
Check of shutoff valve opening
Check of miswiring
Judgment of piping length
Check of refrigerant overcharge
(A1P) with the power off
COMPO. BOX and turn on the power to the outdoor unit and all connected AHUs.
(Be sure to turn the power on at least 6 hours before operation in order to have power
running to the crank case heater.)
below and transmission is normal.
SERV.
MONI-
TOR
HAP
Single system
...ON,
...Blinking
unit PC-board (A1P) with the power on.
Precautions] label on the EL. COMPO. BOX lid. The system operation for about 40
minutes and automatically stops the check operation.
If the malfunction code is not displayed in the remote controller after the system stop,
check operation is completed. Normal operation will be possible after 5 minutes. If the
malfunction code is displayed in the remote controller, correct the malfunction following
[Remote controller displays malfunction code] and perform the check operation again.
C/H SELECTOR
MODE TEST/
MASTE
HWL
IND
H1P
H2P
H3P
H4P
Test Operation
L.N.O.P DEMA-
ND
SLAVE
R
H5P
H6P
H7P
MULTI
H8P