Daikin ERQ Series Service Manual page 128

Condensing unit three phase
Table of Contents

Advertisement

ESiEN09-06 A
(5.3) Y-control
Cooling: T
Heating: T
After C minutes, the units starts to operate.
(5.4) Z-control
Standard Daikin thermostat on/off control.
(6) Target Refrigerant Temperature Setting
(6.1) W-control
Cooling
T
e
W-control
Description
Correction target T
Test Operation
- T
= A
e set
e real
If A > B for C minutes, thermo off is applied for C minutes.
- T
= A
c real
c set
If A > B for C minutes, thermo off is applied for C minutes.
Mode n° setting
Setting switch n°
51
target: T
zone - T pipe - T correction
e
INITIAL VALUE BASE ON ZONE
Adjustable by:
T pipe = Tevapo - T coil AHU = at start 1,5°, T pipe = 0,5 ~ 11°C
T correction: field setting 21-1 (+1 ~ -2°C)
Operation mode
e
Setting position n°
2
00
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
Setting
01
21-1
0
Field Setting
Setting
B (°C)
C (min)
2
3
4
3
6
3
8
3
2
5
4
5
6
5
8
5
2
7
4
7
6
7
8
7
2
10
4
10
6
10
8
10
02
03
2
04
3
119

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents