Initial Start-Up Checklist - TurboChef HHC-3240 Installation Manual

High h conveyor oven
Hide thumbs Also See for HHC-3240:
Table of Contents

Advertisement

14
START-UP

Initial Start-Up Checklist

This form must be completed in its entirety and submitted to TurboChef to activate the warranty and ensure
proper operation. In the case of a multiple oven installation, a "Start-Up Checklist" form must be completed
for
each
oven, noting its position in the stacked confi guration.
You may submit this form by either:
Before attempting to install the oven, ensure all utilities are complete and ready for fi nal connection and
operation. If any of the requirements listed below are incomplete, notify the responsible party to remedy the
condition. The oven must be fully operational and tested before fi nalizing this document.
Requirements:
• Gas Volume: Maximum input per cavity 85k BTU
(25kW [Gross])
• Gas Pressure (Nat and LP): 6" W.C. (152.4 mmH
(14.94 mb) min, 14" (350.6 mm H
It is the recipient's responsibility to report to the freight company any concealed or non-concealed
NOTE:
damage. Check the oven, attachments, installation kit, and oven shipping container for damage. The freight
company must be notifi ed of any claims
It is the technician's responsibility to understand and have available for reference the instructions listed
NOTE:
in the Installation Manual, attached to this form. The manual contains crucial information regarding proper
set-up and operation.
Power Specifi cations
Electrical
Phase
Voltage
Frequency
Current Draw
Supply
Breakers
Plug
-Scanning/emailing to: warranty@turbochef.com
-Mailing to: TurboChef
-Faxing to: 214-379-6085
O, 34.87 mb) max
2
IMMEDIATELY
North America
EU/Asia
1 Phase
1 Phase
208/240 VAC
220-240 VAC
50/60 Hz
50/60 Hz
8 Amp
8 Amp
3 Wire
3 Wire
(L + L + G)
(L + L + G)
20 amp
16 amp
NEMA L620
IEC, 309 3 PIN
Attn: Warranty Department
4240 International Parkway Suite #105
Carrollton, TX 75007
• Gas Shut-Off Valve Size: A minimum .75 inch (19.05
mm) I.D. full fl ow valve is required for single ovens.
O)
A minimum 1 inch (25.4 mm) I.D. full fl ow valve is
2
required for double or triple ovens.
• Ventilation: Operable at the time of this Start-Up
.
Gas
-Volume: Maximum input per cavity
85k BTU (25kW [Gross])
-Min. Pressure (Nat, LP, I
6" W.C. (152.4 mm H2O / 14.94 mb)
-Max. Pressure (Nat, LP, I
14" W.C. (350.6 mm H2O / 34.87 mb)
-Burner Pressure (Nat, LP, I
3.5" W.C. (88.9 mm H
-Burner Pressure (I
4.0" W.C. (101.6 mm H
, I
, I
, I
, and I
2H
2E
2E+
2L
, I
, I
, I
, and I
2H
2E
2E+
2L
, I
, I
, and I
2H
2E
2E+
O / 8.71 mb)
2
):
2L
O / 9.96 mb)
2
):
3P
):
3P
):
3P

Advertisement

Table of Contents
loading

Table of Contents