Recommended Maintenance And Inspection Cycles; Shortened Maintenance And Replacement Cycles - Daikin VRV 5 RXYA8A7Y1B Installer And User Manual

Hide thumbs Also See for VRV 5 RXYA8A7Y1B:
Table of Contents

Advertisement

9
|
Maintenance and service

9.5.2 Recommended maintenance and inspection cycles

9.5.3 Shortened maintenance and replacement cycles

Installer and user reference guide
42
WARNING
Do NOT modify, disassemble, remove, reinstall or repair the unit yourself as
incorrect dismantling or installation may cause an electrical shock or fire. Contact
your dealer.
In case of accidental refrigerant leaks, make sure there are no naked flames. The
refrigerant itself is entirely safe, non-toxic and mildly flammable, but it will
generate toxic gas when it accidentally leaks into a room where combustible air
from fan heaters, gas cookers, etc. is present. Always have qualified service
personnel confirm that the point of leakage has been repaired or corrected
before resuming operation.
Be aware that the mentioned maintenance and replacement cycles do not relate to
the warranty period of the components.
Component
Electric motor
PCB
Heat exchanger
Sensor (thermistor, etc.)
User interface and switches
Drain pan
Expansion valve
Solenoid valve
The table assumes the following conditions of use:
Normal use without frequent starting and stopping of the unit. Depending on the
model, we recommend not starting and stopping the machine more than 6
times/hour.
Operation of the unit is assumed to be 10 hours/day and 2,500 hours/year.
NOTICE
The table indicates main components. Refer to your maintenance and inspection
contract for more details.
The table indicates recommended intervals of maintenance cycles. However, in
order to keep the unit operational as long as possible, maintenance work may be
required sooner. Recommended intervals can be used for appropriate
maintenance design in terms of budgeting maintenance and inspection fees.
Depending on the content of the maintenance and inspection contract,
inspection and maintenance cycles may in reality be shorter than listed.
Shortening of "maintenance cycle" and "replacement cycle" needs to be
considered in following situations:
The unit is used in locations where:
Heat and humidity fluctuate out of the ordinary.
Inspection
Maintenance cycle
cycle
(replacements and/or repairs)
1 year
20,000 hours
25,000 hours
5 years
5 years
25,000 hours
8 years
20,000 hours
20,000 hours
RYMA5+RXYA8~20A7Y1B
VRV 5 heat pump
4P749918-1 – 2023.12

Advertisement

Table of Contents
loading

Table of Contents