Details Of Input Signals (Ad75 Plc Cpu) - Mitsubishi Electric A1SD75P1-S3 User Manual

Positioning module
Table of Contents

Advertisement

3 SPECIFICATIONS AND FUNCTIONS
3.4.2 Details of input signals (AD75
The ON/OFF timing and conditions, etc., of the input signals are shown below.
Device
Signal name
No.
X0
AD75 READY
X1
Axis 1
Start
X2
Axis 2
complete
X3
Axis 3
X4
Axis 1
BUSY
X5
Axis 2
X6
Axis 3
X7
Axis 1
Positioning
X8
Axis 2
complete
X9
Axis 3
XA
Axis 1
Error
XB
Axis 2
detection
XC
Axis 3
XD
Axis 1
M code
XE
Axis 2
ON
XF
Axis 3
Important
* AD75 positioning complete refers to when the output of pulses from AD75 is completed.
Thus, even if the AD75 positioning complete signal turns ON, the system may continue to
operate.
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
PLC CPU)
• When the PLC READY signal [Y1D] turns from OFF to ON, the parameter setting
OFF : READY
complete
range is checked, and if there is no error, this signal turns OFF.
ON : Not
• When the PLC READY signal [Y1D] turns OFF, this signal turns ON.
ready/WDT
• When a WDT error occurs, this signal turns ON.
error
• This is used for the interlock with the sequence program, etc.
PLC READY signal
AD75 READY complete
signal
• When the positioning start signal turns ON, and the AD75 starts the positioning
OFF : Starting
incomplete
process, this signal turns ON.
ON : Start
(The start complete signal also turns ON during zero point return control.)
complete
Positioning start signal
Start complete signal
• This signal turns ON at the start of positioning, zero point return or JOG, and turns
OFF : Not BUSY
ON : BUSY
OFF after the " Da.8 Dwell time" has passed after positioning stop. (This signal
remains ON during positioning.) This signal turns OFF when stopped with step
operation.
• During manual pulse generator operation, this signal turns ON while the " Cd.22
Manual pulse generator enable flag" is ON.
• This signal turns OFF at an error complete or stop.
• This signal turns ON for the time set in " Pr.41 Positioning complete signal output
OFF : Positioning
incomplete
time" from the time that each positioning data No. positioning control is completed.
ON : Positioning
(This does not turn ON when " Pr.41 Positioning complete signal output time" is 0.)
complete *
• If positioning is started (including zero point return), JOG operation or manual pulse
generator operation start is executed while this signal is ON, the signal will turn OFF.
• This signal will not turn ON when speed control or positioning is canceled midway.
OFF : No error
• This signal turns ON when an error listed in section 14.1 occurs, and turns OFF
ON : Error
when the error is reset.
occurrence
• In the WITH mode, this signal turns ON when the positioning data is started, and in
OFF : No M code
setting
the AFTER mode, this signal turns ON when the positioning data positioning is
ON : M code set
completed.
• This signal turns OFF with the " Cd.14 M code OFF request".
• When there is no M code designated (when " Da.9 M code" is 0), this signal will
remain OFF.
• With using continuous path control for the positioning operation, the positioning will
continue even when this signal does not turn OFF. However, a warning will occur.
(Warning code: 503)
• When the PLC READY signal [Y1D] turns OFF, the M code ON signal will also turn
OFF.
• If operation is started while the M code is ON, an error will occur. (Error code: 536)
Details
ON
OFF
[Y1D]
ON
[X0]
OFF
ON
OFF
[Y10]
ON
[X1]
OFF
3 - 13
MELSEC-A

Advertisement

Table of Contents
loading

This manual is also suitable for:

A1sd75p2-s3A1sd75p3-s3Ad75p1-s3Ad75p2-s3Ad75p3-s3

Table of Contents