Installation Of Squat And Brickwork Of The Wall; 蹲便器安装及砌墙 - Kohler ESCALE K-32771T-NS Installation Instructions Manual

Table of Contents

Advertisement

3D� Installation of squat and brickwork of
the wall
3D. 蹲便器安装及砌墙
1. Fixate the leak-proof gasket to syphon as shown in
illustration, and adjust the syphon to the appropriate position
to be fixed to the infall of squat.
Note: Eliminate unwanted syphon.
1. 如图将防漏胶圈套入弯管的端口,然后调整弯管到合适位置
后装在蹲便器的进水口上。
注: 弯管如有多余的长度可以锯掉。
2. When finishing the brickwork of the wall, eliminate unwanted
mask with a sharp knife, if there is mask.
Note: 1. Reserve access panel at front of the tank in remote
installation.
2. Do not remove and discard the mask cover before
installation of the water tank faceplate.
Foreign matters and dusts should be prevented
from entering the water tank during construction.
2. 如图砌完墙后,根据需要,有方外罩时用水口刀把方外罩多
余的长度锯掉。
注: 1. 远程安装时,水箱的前方预留检修口。
2. 方外罩遮板,安装水箱面板前请勿移除和废弃。
避免施工过程中异物及灰尘进入水箱。
1456149-K2-A
Syphon
弯管
Leak-proof Gasket
防漏胶圈
-33-
Mask
方外罩
Cover
遮板

Advertisement

Table of Contents
loading

Table of Contents