Unpacking; Unpacking The Shipping Box; Check The Damage; Lifting And Transportation - Omron CR-UGD4MINI Series User Manual

Delta 3+1 robot ip65 protection class
Table of Contents

Advertisement

1.

Unpacking

1.1

Unpacking the shipping box

The robot comes in a special shipping box.
The following step must be carried out to remove the cover from the box:
• Unscrew the screws from the cover of the wooden box
• Now remove the cover
1.2

Check the damage

First take out the individual components from the package and check that everything is complete according to the
following list:
• 1 x rotational axis (in case of CR_UGD4MINI_R or CR_UGD4MINI_R_TS models)
• 1 x adaptor ring for the rotational axis gear or motor (in case of CR_UGD4MINI_R or CR_UGD4MINI_R_TS
models)
• 1 x TCP - Tool Center Point (in case of CR_UGD4_NR or CR_UGD4_NR_TS models)
• 6 x secondary arms
• 6 x spring package (12 x spring brackets and 12 x spring)
Check all the components and the robot for transportation damage.
1.3

Lifting and transportation

Before the robot is lifted, it must be ensured that it is free from obstructions.
Remove all the screws where the robot is mounted with in the box.
1
No.
1
3 x screws with protection material
The robot must be lifted and transported by using lifting tackle or a forklift truck. Two lifting straps has to be attached
into two eyebolts that are screwed into the baseplate. The lifting straps has to be long enough and must be routed in
such a way that the robot is not damaged.
Description
3
3-1

Advertisement

Table of Contents
loading

Table of Contents