SUPPLY CONNECTIONS

WALL PENETRATION

Direct flue wall penetration requirements
Use the guide pictured to mark the penetration points for the gas supply and flue transition locations.
Consideration must be given to the position of any studs, noggins or other components of the wall structure
on both sides of the wall. Mark these measurements accurately as this is critical to a successful installation.
The penetration for the flue transition only needs to be made for direct flue installations, where the terminal
is directly to the rear of the appliance. If no flue pipe penetration is required the markings are still useful for
indicating the correct position of the flue transition within the enclosure for other flue applications.
For weatherboard walls, drill through the centre of the weatherboard from the outside, then drill from the
inside through the plaster board.
RHFE 952
Gas supply penetration
420 (left)
65
Base of enclosure
RHFE 1253
Gas supply penetration
570 (left)
65
Base of enclosure
Dimensions are in mm.
Rinnai
Flue pipe penetration
Centreline of enclosure
Ø 80~100
430 (right)
Centreline of enclosure
Ø 80~100
Flue pipe penetration
580 (right)