Wall Penetration - Rinnai Evolve 952 Installation Manual

Hide thumbs Also See for Evolve 952:
Table of Contents

Advertisement

Wall penetration

Direct flue wall penetration requirements
Use the guide pictured to mark the penetration points for the gas supply and flue transition
locations. Consideration must be given to the position of any studs, noggins or other components
of the wall structure on both sides of the wall. Mark these measurements accurately as this is
critical to a successful installation.
The penetration for the flue transition only needs to be made for direct flue installations, where the
terminal is directly to the rear of the appliance. If no flue pipe penetration is required the markings
are still useful for indicating the correct position of the flue transition within the enclosure for other
flue applications.
For weatherboard walls, drill through the centre of the weatherboard from the outside, then drill
from the inside through the plaster board.
Dimensions are in mm.
Evolve 952
Gas supply penetration
65
Base of enclosure
Evolve 1253
Gas supply penetration
65
8
| Evolve 952/1253 Installation Guide: 13115-F 06-22
Flue pipe penetration
Centreline of enclosure
Ø 80~100
430 (right)
420 (left)
Centreline of enclosure
570 (left)
Base of enclosure
Flue pipe penetration
Ø 80~100
580 (right)

Advertisement

Table of Contents
loading

Table of Contents