Adjust the tumble dryer screw feet until the machine is level. After the machine has been
aligned, screw the washers tightly to the base plate using a screwdriver.
Tip: Use a level to ensure correct alignment.
Securing the machine
The tumble dryer must be secured to the floor by installing the tensioning strips supplied
over the machine feet.
The material provided is intended for use in bolting the machine to a concrete floor. If
other floor types are present at the installation site, the fastening material must be or-
dered separately.
Electrical connection
The electrical connection must be established by a qualified electrician.
The machine must only be connected to an electrical supply provided in accordance
with local codes and standards. Please also observe the regulations set out by your insur-
ance provider and energy supplier, accident prevention regulations, as well as recognized
codes of practice.
Reliable and safe operation of this tumble dryer is only ensured if it has been connected
to the electricity supply.
The required supply voltage, power rating, and fuse rating can be found on the data
plate on the tumble dryer. Ensure that the supply voltage matches the voltage quoted on
the data plate before connecting the machine to the electricity supply.
Connection to a supply voltage other than the one quoted on the data plate can damage
the tumble dryer if the voltage is too high.
Installation
29