Download Print this page

Samsung AJ CXS CH Series Installation Manual page 19

Advertisement

CAUTION
• Make the electrical connection and leave the system
into "stand by mode". Do not turn on the system! This
is necessary for better vacuum operation (full OPEN
position of Electronic Expansion Valve - EEV -).
Tightening torque for body cap
(Refer to the table)
Charging port cap
Charging core
R-410A: Diameter of the
screw-1/2-20UNF
DB68-12535A-00_IM_23Y FJM Outdoor_AA_EN_.indd 19
DB68-12535A-00_IM_23Y FJM Outdoor_AA_EN_.indd 19
3 Open the valve of the low pressure side of manifold
gauge counter clockwise.
4 Purge the air from the system using vacuum pump for
about 30 minutes.
• Close the valve of the low pressure side of manifold
gauge clockwise.
• Make sure that pressure gauge show -14.5 psi
(-0.1 MPa). after about 30 minutes. This procedure
is very important in order to avoid gas leak.
• Turn off the vacuum pump.
• Remove the hose of the low pressure side of
manifold gauge.
5 Set spindle of both liquid side and gas side of stop
valve to the open position.
6 Mount the valve stem nuts and the service port cap to
the valve, and tighten them with a torque wrench.
Vacuum
Pump
Outer Diameter
[inch (mm)]
Φ1/4 (Ø 6.35)
Φ3/8 (Ø 9.52)
Spindle
Φ1/2 (Ø 12.70)
Φ5/8 (Ø 15.88)
※ The designs and shape are subject to change according
to the model.
Tightening torque
Body cap
Charging port cap
[(lbf·ft (Nꞏm)]
[(lbf·ft (Nꞏm)]
14.8 to 18.4
(20 to 25)
18.4 to 22.1
7.4 to 8.9 (10 to 12)
(25 to 30)
22.1 to 25.8
(30 to 35)
English
19
2023-09-22 오후 1:46:57
2023-09-22 오후 1:46:57

Advertisement

loading