Finalizing The Installation; Mv Units Only - Pilot Flame Inspection - (See Instructions; Gsb2 Units Only - Pilot Flame Inspection - (See Instructions - Travis Industries ProBuilder 54 Linear Installation Manual

Hide thumbs Also See for ProBuilder 54 Linear:
Table of Contents

Advertisement

46

Finalizing the Installation

1. Remove the glass (see page 50).
NOTE:
If using propane (LP) convert the appliance prior to installing the media.
2. We recommend you purge the gas line at this time (with the glass removed). This allows gas to be detected
once it enters the firebox, ensuring gas does not build up.
GSB2 Versions Only
Install the batteries into the battery holder
3. Turn on gas to the heater. Leak test all gas joints prior to starting the appliance. Start the pilot to verify gas
supply (see instructions on page 48). Leak test all the gas joints. Turn the gas control knob to "OFF" to shut
off the appliance.
MV Units Only - Pilot Flame Inspection - (see instructions on page 49)
The pilot flame should look like the illustration below. Adjust the pilot flame if necessary.
To adjust the pilot flame, turn this screw (NOTE: if totally
unscrewed gas will come out of this port). Clockwise
lowers the flame while counter-clockwise raises it.
GSB2 Units Only - Pilot Flame Inspection - (see instructions on page 49)
The pilot flame should look like the illustration below. Adjust the pilot flame if necessary.
The pilot flame should look like the illustration below. Adjust
the pilot flame if necessary.
To adjust the pilot flame, turn this screw. Clockwise lowers
the flame while counter-clockwise raises it
4. Replace the glass.
5. Start the main burner and verify the burner ignites correctly.
6. Leak test all gas joints.
© Travis Industries
Installation
(for qualified installers only)
The pilot flame should touch only the top 3/8" (9mm) of the
thermopile. Adjust the pilot up or down as necessary.
Standard
Screwdriver
Pilot Hood
Thermocouple
The pilot flame should touch the top 3/8" of th
sensing electrode and make contact with the p
hood. Adjust the pilot up or down as necessa
Sensing
electrode
4/12/18 - 1453
Thermopile
3/8"
9mm
Pilot Hood
Spark
Electrode
PB 42 & 54 MV/GSB2 Install

Advertisement

Table of Contents
loading

This manual is also suitable for:

Probuilder 42 linear

Table of Contents