Installation Of Shielded Cables - Riello RLS 300/EV FGR Installation, Use And Maintenance Instructions

Dual fuel light oil/ gas burners
Hide thumbs Also See for RLS 300/EV FGR:
Table of Contents

Advertisement

4.15.1 Installation of shielded cables

In the case of clamp type A:
 unscrew the screw until space is created for inserting the
shielding of the shielded cable A1)(Fig. 32);
 insert the shielded cable with the shielding inside the
clamp A2);
 screw in the screw until it is completely tightened on the
shielding A3).
Do not overtighten.
WARNING
In the case of clamp type B:
 pull the indicated tabs upwards and lift until locked in the open
position B1)(Fig. 32);
 insert the shielded cable with the shielding inside the
clamp B2);
 put pressure on the indicated part until the clamp closes auto-
matically on the shielding B3).
1
D9538
Key (Fig. 31)
1 Motor supply cable
2 Single Phase supply cable
It is very important to shield the motor cable 1) as
shown in Fig. 31.
WARNING
20102963
Installation
D9535
2
Fig. 31
36
GB
A
A1
A2
A3
20131950
B
B1
B2
B3
Fig. 32

Advertisement

Table of Contents
loading

Table of Contents