Measurements to be made and recorded in Performance Test record
Connect the BNC of the Shielded Test Lead to the BNC T on the
1
Voltmeter.
Connect shielded test lead (Pomona 5292-48) to Left Hand supply
1
output via LEMO connector.
Measure the loaded DC voltage of the LH supply output. Record the
2
voltage in the LH output Voltage section of the Performance Test
Record.
Measure the loaded AC (the AC mode of the voltmeter must be selected)
3
output voltage. Record the AC voltage in the LH AC output Voltage
section of the Performance Test Record.
Connect shielded probe to RH supply output via LEMO connector.
4
Measure the loaded DC output voltage of the RH supply output. Record
5
the voltage in the RH output Voltage section of the Performance Test
Record.
Measure the loaded AC (the AC mode of the voltmeter must be selected)
6
output voltage. Record the AC voltage in the RH AC output Voltage
section of the Performance Test Record.
N2775A Power Supply
Performance Verification
15