Kohler ECV940 Service Manual page 166

Table of Contents

Advertisement

Reassembly
Mechanical Governor Control Bracket Components
A
Throttle Lever
E
Cross Shaft
Install Governor Lever (Mechanical Governor Only)
Install governor lever onto governor shaft and connect throttle linkage with black clip.
Adjusting Mechanical Governor
1. Position governor lever so clamping area is inboard but completely on knurled area of governor cross shaft.
2. Move governor lever toward throttle body as far as it will go (wide-open throttle) and hold in position.
3. Insert a long thin rod or tool into hole on cross shaft and rotate shaft clockwise (viewed from end) as far as it will
turn, then torque nut to 7.1 N·m (63 in. lb.).
4. Connect governor spring (with long looped end), to inner hole on governor lever and control bracket.
Connect governed idle spring to outer governor lever hole and control bracket.
Make sure springs do not contact valley baffl e.
166
B
C
D
E
B
Control Bracket
F
Governor Lever
KohlerEngines.com
A
H
F
G
C
Throttle Linkage
G
Governor Spring
D
Linkage Spring
H
Idle Spring
62 690 05 Rev. H

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Command pro efiEcv980

Table of Contents