Opening And Closing The Units; About Opening The Units - Daikin ETSHB16P30EF Installer's Reference Manual

Hide thumbs Also See for ETSHB16P30EF:
Table of Contents

Advertisement

7
|
Unit installation

7.2 Opening and closing the units

7.2.1 About opening the units

Installer reference guide
70
[
mm
≥100
≥500
INFORMATION
Serviceability may be impacted, if the indicated clearances cannot be maintained.
INFORMATION
If you have limited installation space, do the following before installing the unit in its
final position:
The foundation must be strong enough to bear the weight of the unit. Take the
weight of the unit with a storage tank full of water into account.
Make sure, in the event of a water leak, water cannot cause any damage to the
installation space and surroundings.
The foundation must be level and smooth.
Do NOT install the unit in places such as:
In places where a mineral oil mist, spray or vapour may be present in the
atmosphere. Plastic parts may deteriorate and fall off or cause water leakage.
Sound sensitive areas (e.g. near a bedroom), so that the operation noise will
cause no trouble.
In places with high humidity (max. RH=85%), for example a bathroom.
In places where frost is possible. Ambient temperature around the indoor unit
must be >5°C.
In places where the unit is exposed to direct sunlight for long periods of time.
Extensive UV radiation can damage the unit.
Mind the measurement guidelines:
Maximum height difference between indoor unit and outdoor
unit
Maximum total water piping length
(a)
Precise water piping length can be determined using the Hydronic Piping Calculation tool.
The Hydronic Piping Calculation tool is part of the Heating Solutions Navigator which can
be reached via https://professional.standbyme.daikin.eu. Please contact your dealer if you
have no access to Heating Solutions Navigator.
At certain times, you have to open the unit. Example:
When connecting the electrical wiring
When maintaining or servicing the unit
]
a
a ≥100
a+b ≥600
b ≥300
"7.4.4 To connect the drain hose to the
b
drain" [
4
 84].
50 m
EPRA14~18DAV3+W1 + ETSH/X(B)16P30+50EF
Daikin Altherma 3 H HT ECH₂O
4P679467-1 – 2022.02
10 m
(a)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents