Download Print this page

Exmark Lazer Z LZE Operator's Manual page 70

Advertisement

Maintenance
1. Adjuster link
2. Jam nut
• S and E-Series:
Fine tune the front deck lift assembly by
turning the adjuster screw until it reaches the
3 inch (7.6 cm) height (see Figure 54).
1. Adjuster screw
11.
Measure the back tip height. Fine tune rear
adjusters as required; the single point adjustment
can be utilized to gain more adjustment.
Figure 53
3. Adjuster
Figure 54
2. Jam nut
• Side Discharge Units: The back tips of the
side blades should measure 3 1/4 inches (8.3
cm).
• Rear Discharge Units: The back tips of the
side blades should measure 3 inches (7.6 cm).
12.
Re-measure until all four sides are the correct
height. Tighten all the nuts on the deck lift arm
assemblies.
13.
Lower discharge deflector (side discharge units
only).
14.
If the four deck adjusters do not have enough
adjustment to achieve accurate cut height with the
desired rake, the single point adjustment can be
utilized to gain more adjustment (see Figure 55).
g011839
1. Single point height adjustment bolt
2. Front height-of-cut plate mounting bolt
3. Rear height-of-cut plate mounting bolt
15.
To adjust the single point system, first loosen the
front and rear height-of-cut plate mounting bolts.
g012075
Note: On Rear Discharge Units: The mower
deck is attached in the front holes at the factory
(see Figure 56). If needed, use the back holes for
further adjustment when leveling the mower deck.
70
Figure 55
g017054

Advertisement

loading

This manual is also suitable for:

Lazer z lzsLazer z lzx411294212