Refitting The Throttle Body - APRILIA RSV 1000 R FACTORY 2003 Workshop Manual

Table of Contents

Advertisement

FUEL SYSTEM
3.3.4.

REFITTING THE THROTTLE BODY

CAUTION
After disassembling the throttle body, replace
all the gaskets, O-rings, torsion springs,
bushes and seals. These components are sup-
plied with the repair kit.
Fit the new O-rings (1) and seals (2) on both injectors.
Insert the injector (3) in the left injector support (4) and
in the right injector support (5).
Fit the left injector support gasket (6), right injector
support gasket (7) and the two seals (8) on the throttle
body.
Install the complete left injector support (4) and right in-
jector support (5) in the throttle body, fastening them
with the new M6x25 (9) (10) screws respectively.
If the synchronizing screws (11) and respective O-rings
(12) have been replaced, tighten the screws (11) until
they touch the stop and then unscrew them a single
turn.
Presetting of synchronizing screws (11): 1 turn.
CAUTION
The precise adjustment of the screws (11) must
be performed using a vacuum gauge.
Fasten the fuel pressure regulator (13) using the two
M6x16 screws (14).
NOTE Smear a film of grease over the surfaces of the ful-
crum pin (18).
Insert the cold-start lever (15), torsion spring (16) and
shaft-sealing ring (17) on the fulcrum pin (18).
Insert the complete fulcrum pin (18) in the throttle ca-
ble support bracket.
NOTE Make sure the torsion spring is hooked to the cold-
start lever (15) and the cable support bracket.
Spray chain grease on the spring (16).
Insert the shaft-sealing ring (17) on the fulcrum pin
(18).
Fit the two bushes (19) and torsion spring (20).
Fit the pulley (21) on the throttle cable support bracket.
3 - 24
RSV 1000 R - RSV 1000 R FACTORY

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rsv 1000 r 2003

Table of Contents