Lincoln Electric SPIRIT II 275 Technical Manual page 94

Plasma cutting system with fineline high definition technology
Hide thumbs Also See for SPIRIT II 275:
Table of Contents

Advertisement

Section 5: Torch Consumables and Cutting Charts
H17 Plasma / Nitrogen Shield / Nitrogen Preflow & Postflow
This gas combination gives the best cut quality and minimum dross levels
Shield Cap
BK277211
Outer Cap
BK284150
Imperial*
Material
Preflow
Thickness
(in)
(psi)
3/8
1/2
5/8
40
3/4
1.0
1.25 **
Metric*
Material
Preflow
Thickness
(mm)
(psi)
10
12
16
40
20
25
32 **
Marking* – For All Material Thicknesses
Type of Gas
Preflow
(Plasma)
(Shield)
(psi)
Nitrogen
Nitrogen
N/A
Argon
Nitrogen
N/A
WARNING
Do not connect H17 (combustible gas) as an input gas (Pre/Postflow, Plasma, or Shield) at the same time as
Oxygen or Air.
* Use an arc transfer height (ignition height) of .250" (6.4 mm) for cutting and .100" (2.5 mm) for marking.
** Edge start recommended.
(Revised 04/26/2013)
This information is subject to the controls of the Export Administration Regulations [EAR]. This information shall not be provided to
non-U.S. persons or transferred by any means to any location outside the United States contrary to the requirements of the EAR.
Stainless Steel - 260 Amps - Copper Electrode
(H17 = 17.5% Hydrogen / 32.5% Argon / 50% Nitrogen)
Nozzle
BK277118
Retaining Cap
BK277280
Plasma
Shield
Postflow
(psi)
(psi)
(psi)
63
64
63
Plasma
Shield
Postflow
(psi)
(psi)
(psi)
63
64
Plasma
Shield
Postflow
(psi)
(psi)
(psi)
25
25
N/A
50
25
N/A
BK277135
Swirl Ring
BK277139
Arc
Travel
Voltage
Speed
(volts)
(ipm)
145
85
142
80
145
65
150
55
160
33
170
26
Arc
Travel
Voltage
Speed
(volts)
(mm/m)
144
2140
142
2060
145
1640
63
151
1315
159
875
170
650
Arc
Travel
Voltage
Speed
(volts)
(ipm) (mm/min)
108
250
6350
75
100
2540
5-32
Spirit II User's Manual
Electrode
Torch Head
BK279100
Cutting
Pierce
Pierce
Height
Height
Time
(in)
(in)
(msec)
.160
.250
500
.140
.300
600
.185
.350
800
.225
.400
1200
.250
.450
1500
.280
.350
Cutting
Pierce
Pierce
Height
Height
Time
(mm)
(mm)
(msec)
4.0
6.5
600
3.7
7.3
4.7
8.9
800
5.8
10.3
6.3
11.3
1500
7.1
8.7
Marking
Initial
Height
Height
(in)
(mm)
(in) (mm) (msec)
.100
2.5
.100
2.5
.160
4.1
.100
2.5
Kerf
Width
(in)
.190
.195
.200
.205
Kerf
Width
(mm)
4.8
5.0
5.1
5.2
Pierce
Time
0
0

Advertisement

Table of Contents
loading

Table of Contents