Coin Operation - Asko WMC67 P Series User Manual

Table of Contents

Advertisement

Installation and connection

Coin operation

(Only available in some models)
The machine is prepared for coin operation.
Owner/distributor can find detailed informations in Service manual.
Such installation must be carried out by a qualified professional.
The coin meter shall be able to short circuit two signal lines for periods of up to 10 minutes.
This will allow the user to load the appliance, choose a program and start the program after inserting
the coins.
"Please pay to continue" appears on the display when the machine is started with the main power
switch (by pressing on button Start).
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wm75 c seriesWm75 p seriesWmc6744pp.sWmc6743pf.s

Table of Contents