Unpacking; Uncrating - 3M Matic 700a Instructions And Parts List

Adjustable case sealer with accuglide 3 taping heads
Hide thumbs Also See for Matic 700a:
Table of Contents

Advertisement

6-UNPACKING

6.1 Uncrating

The envelope attached to the shipping box contains
the uncrating instructions of the machine (Figure 6-1).
Cut straps. Cut out staple positions along the bottom
of the shipping box (or remove staples with an
appropriate tool - Figure 6-2)
After cutting out or removing the staples, lift the
shipping box in order to clear the machine
(two persons required).
Transport the machine with a fork-lift truck to the op-
erating position. Lift the pallet at the point indicated in
Figure 6-3 (weight of machine + pallet = See Specifi -
cations).
700a-NA
Figure 6-1
Figure 6-2
Figure 6-3
Removal of Pallet
Using a 10mm combination wrench, remove the
fasteners that secure the case sealer legs to pallet at
each leg (as shown in Figure 6-4).
Figure 6-4
A package is located under the machine body. Retrieve
the instruction manual for additional procedures of the
set up. The package also contains parts removed for
shipping, spare parts and tools (Figure 6-5).
Figure 6-5
6.2 Disposal of Packaging Materials
The 700a package is composed of:
- Wooden pallet
- Cardboard shipping box
- Wooden supports
- Metal fi xing brackets
- PU foam protection
- PP plastic straps
- Dehydrating salts in bag
- Special bag of laminated polyester/aluminium/
Polyethylene (sea freight package only)
- Polyethylene protective material
For the disposal of the above materials, please follow
the environmental directives or the law in your country.
16
2011 June

Advertisement

Table of Contents
loading

This manual is also suitable for:

40800

Table of Contents