FINISHING COMMISSIONING

The boiler has been factory set, so there should be no need to adjust
combustion settings.
REPLACE OUTER CASING:
1. Replace outer casing making sure that the securing points are
properly located.
▶ Press the clip (A) downwards to secure casing on top.
▶ Retighten bottom two screws (B).
INSTALLING BOTTOM PANEL:
2. The bottom panel slides onto two ledges (C) either side of the boiler
frame.
▶ Hold the panel up against the underside of the boiler and slide
towards the rear until it is fully engaged.
HANDOVER:
▶ Complete the Benchmark check list.
▶ The fascia cover is opened by pulling the flap (D) towards you.
▶ Set up the controls and show the user how to operate all the controls
shown in the User Guide.
▶ Place the user guide into the tray (E) on the inside of the facia cover.
▶ If the appliance is unused and exposed to freezing conditions; shut off
all the mains supplies and drain the system and boiler.
A
Fig. 53 Fitting outer case
6 720 812 175 (2014/07)
B
B
6720647361-25.3Wo
D
Fig. 54 Fitting bottom panel
COMMISSIONING
C
6720647361-26.3Wo
35