Section 4 - Operation - Hobart Handler 130 XL Owner's Manual

Table of Contents

Advertisement

4-1. Controls
SECTION 4 – OPERATION
1
2
3
1
Voltage Switch
The higher the selected number,
the thicker the material that can be
welded (see weld setting label in
welding power source). Do not
switch under load.
2
Voltage Switch - Fan Only
Position
In Fan Only position, fan runs but
there is no weld output.
3
Wire Speed Control
Use control to select a wire feed
speed. As Voltage switch setting in-
creases, wire speed range also in-
creases (see weld setting label in
welding power source).
4
4
Power Switch
Ref. ST-187 921
OM-210 082 Page 15

Advertisement

Table of Contents
loading

Table of Contents