Installing A Flexible Slot (Redundant) Power Supply Enablement Option - HP ProLiant ML30 Gen10 User Manual

Table of Contents

Advertisement

Installing a Flexible Slot (Redundant) power supply enablement option

Installing a Flexible Slot (Redundant) power supply enablement option
Prerequisites
Prerequisites
Before installing the Flexible Slot (Redundant) power supply enablement option, read the power supply warnings and cautions.
Before you perform this procedure, make sure that you have the following items available:
Flexible Slot (Redundant) power supply enablement option
Hot-plug power supply
T-15 Torx screwdriver
Procedure
Procedure
1. Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Disconnect all peripheral cables from the server.
4. Do one of the following:
If the server is in tower mode: Position the tower server for hardware configuration.
If the server is in rack mode: Remove the server from the rack .
5. Remove the front bezel .
6. Remove the access panel .
7. If installed, remove the air baffle .
8. Disconnect all power supply cables from the system board, drive cages, and devices.
9. Remove the non-hot-plug power supply.
10. Install the RPS cage.
Installing a Flexible Slot (Redundant) power supply enablement option
79

Advertisement

Table of Contents
loading

Table of Contents