Preparing The Server For Rack Installation - HP ProLiant ML30 Gen10 User Manual

Table of Contents

Advertisement

Preparing the server for rack installation

Preparing the server for rack installation
Procedure
Procedure
1. Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Disconnect all peripheral cables from the server.
4. If installed, unlock and remove the security padlock and/or the Kensington security lock.
For more information, see the lock documentation.
5. Place the server on the side and access panel facing up .
Preparing the server for rack installation
65

Advertisement

Table of Contents
loading

Table of Contents