Upgrade Procedure - Nortel V2 Release Note

Nortel v2 software: release note
Table of Contents

Advertisement

30 Appendix A
Appendix A

Upgrade Procedure

One of two upgrade procedures are available for upgrading to Vector Release
VSS2.0.9. Use the following guidelines to determine which upgrade procedure
to use.
There is also an out of service downgrade described in A.3 Out of Service
Downgrade procedure.
WARNING There should NOT be any hardware or provisioning
changes done during either upgrade or downgrade procedure.
The following table summarizes the previous bullets.
Table 1 Upgrade procedures to use to upgrade to release 2.0.9
Upgrade From
2.0.8
2.0.7
2.0.7
2.0.6 or earlier
Magellan Vector 2.0 Release Note, Issue 1.9.1
Customers who are upgrading from VSS2.0.8 or higher (all
configurations) must use the upgrade procedure provided in the Software
Installation and Commissioning for Vector and AccessShelf NTP 241-
9501-200.
Customers who are upgrading from VSS2.0.7 and do not have pmp
connections configured must use the upgrade procedure provided in the
Software Installation and Commissioning for Vector and AccessShelf NTP
241-9501-200.
Customers who are running Vectors with release VSS2.0.7 and have been
configured with point to multipoint connections must use the procedure
described in section A.2 Out of Service Upgrade procedure. This is an out
of service upgrade procedure which must be used in order to correctly
recover all the point to multipoint connections.
Customers who are running Vectors with release VSS2.0.6 or earlier must
use the procedure described in section A.2 Out of Service Upgrade
procedure.
Condition
All configurations
No PMP
PMP connections
All configurations
Procedure to Use
In Service Upgrade
In Service Upgrade
Out of Service Upgrade
Out of Service Upgrade

Advertisement

Table of Contents
loading

Table of Contents