Checkout Procedures - Trane 2TEE3F39A1000A Installer's Manual

Convertible variable speed – air handlers 3.5 - 5 ton
Table of Contents

Advertisement

SUPPLEMENTARY HEATERS CHECKOUT PROCEDURES,
1. Be sure the disconnect switch is "OFF", and safety label (if any) is attached ................................................ [ ]
2. Check on field wiring for tight connections and grounding according to codes ............................................... [ ]
3. Check circuit protection for proper size per nameplate specifications ........................................................... [ ]
4. Check control box panel — in place and secured .......................................................................................... [ ]
NOTE: OPERATION OF HEATERS MUST BE CHECKED DURING THE OPERATION CHECK OF THE TOTAL
SYSTEM.
American Standard Inc.
6200 Troup Highway
Tyler, Texas 75707
For more information contact
your local dealer (distributor)

CHECKOUT PROCEDURES

After installation has been completed, it is recom-
mended that the Air Handler be checked against the fol-
lowing checklist.
1. Make sure power is "OFF" at power disconnect
switch ........................................................................ [ ]
2. Check all field wiring for tight connections. See that
grounding of unit is in accord with code ................. [ ]
3. Make sure unit suspension (if used) is secure and
that there are no tools or loose debris in, around or on
top of the unit ........................................................... [ ]
4. Check all duct outlets; they must be open and unre-
stricted ...................................................................... [ ]
5. Check drain lines and be sure all joints are tight
.................................................................................. [ ]
6. Make sure secondary drain pan is installed ..... [ ]
7. Check power supply for correct requirements per
unit nameplate ......................................................... [ ]
8. Check filters for proper size. Inform owner of
proper procedure for removal and reinstallation.... [ ]
9. Energize the system and carefully observe its op-
eration; make any necessary adjustment ............... [ ]
10. Instruct owner, engineer (if possible) on proper
operating procedure and leave Use and Care Manual
with owner................................................................ [ ]
IF a heater is USED, see "limitations and recommendations"
to determine if the heater requires a SPECIAL CIRCUIT.
Since the manufacturer has a policy of continuous product and product data improvement, it reserves the
right to change design and specifications without notice.
P.I. 03/07