Section 19. Checkout Procedures - Trane GAF2A0A36M31EC Installer's Manual

Convertible air handlers 3 ton
Table of Contents

Advertisement

Section 19. Checkout Procedures

19.1 Operational And Checkout Procedures
Final phases of this installation are the unit Operational and Checkout Procedures. To obtain proper performance,
all units must be operated and charge adjustments made in accordance with procedures found in the Service
Facts of the Outdoor Unit.
After installation has been completed, it is recommended that
the entire system be checked against the following list:
1. Be sure unit suspension (if used) is secure and that there
are no tools or loose debris in or around or on top of the
unit. .............................................................................. [ ]
2. Properly insulate suction lines and fittings. .................. [ ]
3. Properly secure and isolate all refrigerant lines. .......... [ ]
4. Verify that all electrical connections are tight. .............. [ ]
CHECKOUT PROCEDURE
5. Check all duct outlets; they must be open and
unrestricted. ................................................................. [ ]
6. Check drain lines and be sure all joints are tight. ........ [ ]
7. Be sure the return air filter is installed. ......................... [ ]
8. Be sure that the correct airflow setting is used.
(Indoor Blower Motor). ................................................. [ ]
9. Operate complete system in each mode to
verify proper performance. Verify operation of
supplementary electric heater. ..................................... [ ]
31