SeaTalkng ® spur connector — connects to spur connection on the SeaTalkng ® network.
2. + Red (positive) wire — connects to battery or distribution panel positive terminal.
3. – Black (negative) wire — connects to battery or distribution panel negative terminal.
4. Ground wire connects to RF ground point, if no ground point is available connect to the battery
negative (-) terminal.
Implementation — connection to distribution panel
1.
Waterproof fuse holder with 5 A inline fuse must be fitted (not supplied).
2. SeaTalkng ® power cable.
3. RF Ground connection point for drain wire.
• Ideally, the SeaTalkng ® power cable should be connected to a suitable breaker or switch on the
vessel's distribution panel or factory-fitted power distribution point. It is recommended that a 5 A
inline fuse is fitted to the red (positive) wire of the SeaTalkng ® power cable.
• The distribution point should be fed from the vessel's primary power source by 8 AWG (8.36 mm
cable.
• Ideally, all equipment should be wired to individual suitably-rated thermal breakers or fuses, with
appropriate circuit protection. Where this is not possible and more than 1 item of equipment shares
a breaker, use individual in-line fuses for each power circuit to provide the necessary protection.