SERVICES PREPARATION
1
2
3
4
Flush water line into a bucket.
Install a hand shut-off valve in a
readily accessible location in the
adjacent cabinetry.
Hot water line installations:
Carefully route the hot water line
through the service hole in the side of
the cabinetry.
Route the hard wiring through the
service hole in the side of the cabinetry.
Tape to the floor to secure.
Remove the toe kick by unscrewing the
four screws.
Keep aside for re-assembly at the end of
the installation.
DOOR PANEL PREP
1
2
3
4
Ensure door panel meets
all specifications.
Using the template as a guide, pre-drill
all holes into the panel.
Ensure the sliding bracket is oriented
correctly before securing it to the panel.
Loosely fit both 16mm Philips hanging
screws onto the door panel. Ensure
there is a minimum space of 1/8" (3mm)
between the screw-head and the panel.
13