2.6 Operation
Monitor the communication status of installed PLC adaptors.
What to prepare
Installed PLC adaptor
HUB
PC for Operating tool (Monitoring Tool previously installed)
LAN HUB
(1) Connect the PC to the same LAN network as the PLC adaptor.
(2) Launch the Monitoring Tool on the PC.
(3) Configure the Monitoring Tool.
If the installed PLC adaptor is not displayed, problems such as slow connection speed occur, so please
follow the troubleshooting procedure.
AC 100-240 V
Installed PLC Adaptor
24
DA-PU100 Series Administrator's Manual
PC for Operation tool