Heat & Glo SL-5F-IFT Installation Manual page 22

Hide thumbs Also See for SL-5F-IFT:
Table of Contents

Advertisement

Top Vent - Horizontal Termination - (continued)
Two Elbows
Note: Use SLP Series
components only.
**
Note: When using SLP-FLEX (6-5/8 in.) venting, there
MUST be a 25% reduction in total H when using flex vent.
See Figure 4.8.
WARNING *
Fire Risk.
• When using SLP-HRC-SS termination cap
on top vented fireplaces, a one foot minimum
vertical vent section is required before installing
first elbow.
H
Figure 4.13
22
2
INSTALLED
HORIZONTALLY
Heat & Glo • SL-5F-IFT, SL-7F-IFT Installation Manual • 2638-980 Rev. H • 6/22
V
Minimum
1
90 Elbow Only*
1/2 ft.*
152 mm
1-1/2 ft.
457 mm
2-1/2 ft.
762 mm
3-1/2 ft.
1.1 m
4-1/2 ft.
1.4 m
H
+ H
MAX. =14 ft. (4.3 m)
1
2
V
+ H
+ H
MAX. = 40 ft. (12.2 m)
1
1
2
*See Warning Below.
H
1
H
+ H
Maximum**
1
2
1/2 ft.
152 mm
1 ft.
305 mm
2 ft.
610 mm
4 ft.
1.2 m
6 ft.
1.8 m
14 ft.
4.3 m
V
1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sl-7f-ift

Table of Contents