Package Replacements; System Responses - Nortel Meridian SuperNode SL-100 Reference Manual

Intelligent peripheral equipment (ipe)
Hide thumbs Also See for Meridian SuperNode SL-100:
Table of Contents

Advertisement

6-2 Feature implementation

Package replacements

System responses

While the IPE is being loaded by the LOADPM command using the IPE level
of MAP workstation, the progress of the loading is echoed on the MAP
terminal. All responses displayed on the MAP terminal have concise
descriptions to explain the result or problem to the user.
The following table gives some examples of IPE downloading responses.
Table 6-1 Examples of IPE downloading responses (Sheet 1 of 2)
Response
IPE ipe_number
PASSED
REQUEST INVALID:
IPE ipe_number IS
status
555-4001-129 Standard 08.01 November 2000
New order code for AS1065D (package for DC IPE shelf which uses
NT7D07AC) is NTZB98BA (uses NT7D07BA)
New order code for AS1065A (package for AC IPE shelf which uses
NT7D07AC) is NTZB98AA (uses NT7D07BA)
For upgrades from the NT7D07AC to the new NT7D07BA the order code
is NTZB99AA. This order code includes the following:
— NT7D07BA IPE Controller Card
— NT5D45AA 3 ft ethernet cable
— NT5D46AA ethernet IPE bulkhead adapter
Response
The IPE software
load has been
successfully loaded
from the SL-100
system.
The IPE is in the
incorrect state for
loading.
Action To Be Taken
None.
The IPE must first be ManB
before loading the IPE
software.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meridian sl-100

Table of Contents