Electrical Connection; Programming The End Positions - GEM 1235 Operating Instructions Manual

Electrical position indicator
Table of Contents

Advertisement

11 Electrical connection

1. Screw the electrical position indicator 6 onto the adapter 7.
2. Use the spanner flat 8 (WAF 27) of the travel sensor to tighten the electrical position indicator.
3. Turn the housing clockwise to align the pneumatic or electrical connections.
4. Initialize the product.
11 Electrical connection
11.1 IO-Link, device version 3E / 4E
2
3
5
1
4
1
U, 24 V DC, supply voltage
2
24 V DC, Open end position output
3
U, GND
4
24 V DC, Closed end position output, C/Q IO-Link
5
24 V DC, programming input (speed
Device version 3S / 4S is pin compatible with the previous version 2SM125, pin 5 is highly active
but without potential-free contacts. The device has 24 V DC Push-Pull outputs

12 Programming the end positions

The end positions must be programmed under the following conditions:
- Retrofitting an electrical position indicator
- Replacing the actuator
- Replacing the diaphragm
If electrical position indicators have been fitted to the process valve at the factory, the end positions will already have been pro-
grammed.
The end positions can be programmed as follows:
- On-site programming
- Programming input (pin 5)
- Communication interface
When programming via the communication interface, automatic programming is recommended.
GEMÜ 1235
24V / IO-Link, 3E, 4E
Description
AP
function)
18 / 26
6
8
7
www.gemu-group.com

Advertisement

Table of Contents
loading

This manual is also suitable for:

12361436 eco

Table of Contents