CRB Setup—Crystal Forest
3. With socket doors open, the SOIC8 package can be installed.
4. Align SOIC with guide slots. It is not necessary to apply pressure.
5. Align the pin 1 indicator on the IC with the pin 1 dot on the board silkscreen.
October 2012
Order No.: 328009-001US
®
®
Intel
Xeon
Processor E3-1125C with Intel
®
Communications Chipset 8910 Development Kit
User Guide
25