BASIC MAINTENANCE SCHEDULE - MITSUBISHI ENGINE

Refer to the original equipment manufacturer's operating manual for a complete list of
maintenance requirements. Failure to comply with the procedures as described in the engine
operator's manual will nullify the warranty, decrease performance and cause equipment
damage or premature equipment failure. Maintenance records may be required to complete
Use the schedule in the following table as a guide for regular maintenance intervals. For additional or replacement
copies of the engine operator's manual, contact an authorized dealer in your area.
Item
Check Oil Level
Check Coolant Level
Check Fuel Level
Check Tire Pressure
Check All Electrical Connections
Inspect Radiator Fins For Debris, Clean As
Required
Inspect Light Tower Winch For Proper Operation
Fuel Tank - Drain Water
Check Air Cleaner
Replace Engine Oil And Oil Filter
Belt And Belt Tension - Inspect And Adjust
Replace Fuel Filter
Drain And Clean Fuel Tank
Check Glow Plugs
Lubricate Leveling Jacks
Bolts And Nuts On The Engine - Retighten
Replace Heated Fuel Filter (If Equipped)
Inspect Engine Starting Battery
Air Cleaner Element - Clean, Check And Replace
Fuel System - Bleed Air
Water Sedimenter - Drain Water
*
Perform after the initial 50 hours of operation, then on the regularly scheduled interval indicated in the schedule
above.
**
Certain conditions may require the fuel tank to be drained and cleaned more often. When operating in extremely
dusty conditions, clean the fuel tank as often as necessary.
WINCH USE, OPERATION & MAINTENANCE - MANUAL
PRIOR TO USE
Inspect rope or cable and replace if damaged.
Check mounting hardware for proper tightness and re-torque if necessary.
Gears, ratchet pivot point and shaft bushings must be kept lubricated with a thin oil or grease.
OPERATION
Take Line/Load In:
1. The cable must be securely fastened to the object being lifted and to the winch drum.
28
a warranty request.
50
250
Daily
Hours
Hours
*
400
500
1000
Hours
Hours
Hours
Required
**
*
As