Cut & Plan Views; Installation - Hussmann ESH Installation And Operation Manual

Single-deck service hot food case
Table of Contents

Advertisement

Rev. 0010
Self-Service Case Front Glass
1
Opening 28
/
" Surface Warmer
2
replaces Hot Well NOTE: Non-
Glare Glass Coating on Service
Case Only
13
5
/
"
8
WELLS
46
3
/
"
4
COMBO CASES
Plan View
UNCRATING THE STAND
Place the fixture as close to its permanent position as
possible. Remove the top of the crate. Detach the walls
from each other and remove from the skid. Unbolt the
case from the skid. The fixture can now be lifted off the
crate skid. Lift only at base of stand!
EXTERIOR LOADING
These models have not been structurally designed to sup-
port excessive external loading. Do not walk on their
tops; This could cause serious personal injury and dam-
age to the fixture.
SETTING AND JOINING
The sectional construction of these models enable them
to be joined in line to give the effect of one continuous
display. A joint trim kit is supplied with each joint.
Glass
Top
8
3
/
"
4
5
11
/
"
16
Hot Well
2
3
/
"
16
30
15
/
"
16
46
3
/
"
4
ESHS
Service Hot
46
3
/
"
46
3
/
"
4
4
Cut & Plan Views
Self-Service Case Front
Glass Opening 28
Surface Warmer
Replaces Hot Well
7
/
"
8
8"
1"

Installation

Before Rasing the Glass retighten all
screws along clamshell!
3
1
/
"
2
Polycarbonate
Doors
Light
Food
Warmer
27"
Hot Well
2
1
/
16
30
1
/
"
11
3
/
"
4
8
43
11
/
"
16
ESH
(-SS)
Hot Foods
DRAIN*
ELEC.
&
MECH.
WATER*
STUB UP
STUB UP
19" X 19"
19" X 19"
CASE FRONT
(VARIABLE LENGTHS)
Plan View
* WATER & DRAIN ON
HOT SERVICE CASE ONLY
"
1"

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eshs

Table of Contents