Summary of Contents for Hussmann IMPACT Elite E2V
Page 1
Joining Kit, making sure there is no breakage or damage. CAUTION DO NOT remove rider until case is in its final position. HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 (Printed in U.S.A.) x 180 x 120 -18 x 1 Front - 18...
Page 2
B. Display Pans, C. Rear Pan Bracket and Upright, D. Rear Panel and Discharge Grille, E. Front Return Air Grille from case. See Figure 1. Figure 1. Removing Items from Case HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 (Printed in U.S.A.)
Page 3
Alignment Pins Figure 2. Checking Alignment Pins Alignment Pin Apply 1 (41 mm) Figure 3. Applying 1 HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 (Printed in U.S.A.) gasket to both cases. in. and in. Gaskets to the Merchandiser P/N 0430502 Apply 1 in.
Page 4
Silicone (Item – 4) along the perimeter of the case as shown in Figure 4. DETAIL C. HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 (Printed in U.S.A.) In addition, apply silicone around the perimeter of the front box bracket...
Page 5
Gasket DETAIL E. Silicone DETAIL G. Figure 5. Applying Top and Front Gasket Pads HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 (Printed in U.S.A.) Install the Front Gasket Pad, (Item – 6) over silicone applied in previous step. See Detail E.
Page 6
Alignment DETAIL H. CASE 1 Alignment Pins DETAIL I. HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 (Printed in U.S.A.) The complete lineup must be leveled to the highest point of the floor. After the first merchandiser has been set, position the second so the end frames touch.
Page 7
NSF specifications. Figure 7. Overview of Fastener Locations HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 (Printed in U.S.A.) Follow the sequence correctly when bolting the cases together. See Figure 7, Detail K.
Page 8
Front Electrical Wires always here DETAIL L. Figure 8. Fastening Rear of Cases Together (Sequence B) HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 (Printed in U.S.A.) WARNING Use caution when installing fasteners around wiring or refrigeration lines inside of struts.
Page 9
Lock Washers (Item – 20 ) Hex Nut (Item – 21), and Cap Plug (Item – 22). See Figure 9. Cap Plug CASE CASE Figure 9. Fastening Top Fronts of Cases Together (Sequence C) HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 (Printed in U.S.A.)
Page 10
Figure 10. Joining Rear Sill Gasket Silicone Silicone Interior Exterior Figure 11. Front Lighting Rail Joining Plate HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 (Printed in U.S.A.) Joining Plate Use only specified fasteners. Longer screws will penetrate 10-24 x Machine Screw ®...
Page 11
Detail N. Push trim into silicone Figure 12. Sealing and adding trim to the Front Joint of Case HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 (Printed in U.S.A.) CASE 1 Note: Cases are shown apart for clarity of trim and location...
Page 12
Also apply silicone over each end of the Joint Cover. See Figure 13. Joint Cover Silicone Joint Figure 13. Installing and Sealing Joint Cover HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 (Printed in U.S.A.) Bottom Joint Cover Case Bottom Case Bottom Joint Cover ®...
Page 13
Vertical Glass Service Merchandisers Joining Instruction Figure 14. Sealing Case Joints HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 (Printed in U.S.A.) P/N 0430502 EALING THE OF THE Apply a smooth continuous bead of silicone over the Exterior Top Joint of the cases.
Page 14
Install the Splashguard Joint Support (Item – 26) to the splashguard retainer using Screws (Item – 27). See Figure 15. Splashguard Retainer Figure 15. Installing the Splashguard Joining Bracket and Splashguard HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 (Printed in U.S.A.) Splashguard ®...
Page 15
Miter Box Figure 16. Installing Impact Bumper Retainer 2 Foot (610mm) Starter Bumper Figure 17. Installing and offsetting Bumpers HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 (Printed in U.S.A.) 2 Foot (610mm) Starter Bumper Full Length Bumper P/N 0430502 NSTALL UMPERS A.