Cover Bolts Torque
14 ft. lbs. (19 Nm)
5. Install the output hub into the gearcase housing.
The output hub should spin freely.
6. Install the ring gear into the gearcase housing.
7. Slide the roll cage into the ring gear. Insert the
rollers as the roll cage is installed.
7.18
8. Install the shim onto the ring gear.
9. Install the armature plate onto the ring gear.
NOTE: Be sure armature plate tabs are placed into
the slots on roll cage.
10. Apply grease to the thrust bearing. Insert the
thrust bearing onto the output hub. Insert the
output hub, dowel, and thrust bearing into the ring
gear.
FINAL DRIVE