Installation; Installation Of Uc800 Control Upgrade; Check The Configuration And Set-Points In The Adaptview Display; Save The Adaptview Configuration And Set-Points - Trane Symbio 800 Installation Instructions Manual

Control upgrade kit for uc800 adaptiview display
Table of Contents

Advertisement

Installation

Installation of UC800 Control
Upgrade
Check the Configuration and Set-Points in
the AdaptView Display
Important:
Verify the UC800 firmware is upgraded to
the most recent version before creating the
chiller service report for conversion to
Symbio.
The conversion utility is only designed to
work with the most recent version of UC800
firmware.
Figure 3.
Tracer TU
WARNING
Hazardous Voltage and Equipment
Damage!
Failure to follow instructions below could result in
death or serious injury.
CT terminals are referenced to neutral on the meter and
may be at elevated voltages. Do not contact meter
terminals while the unit is connected. Do not connect
or short other circuits to the CT terminals.
Disconnect all electric power, including remote
disconnects before servicing. Follow proper lockout/
tagout procedures to ensure the power can not be
inadvertently energized. Verify that no power is present
with a CAT III or IV voltmeter rated per NFPA 70E.
CDUB-SVN002B-EN
1. Check the current configuration of the AdaptView and
confirm that all settings are correct. Make any
necessary changes.
2. Check all of the current chiller set-points programmed
into the AdaptView and confirm that they are all correct
for the unit. Make any necessary changes.
Save the AdaptView Configuration and
Set-Points
Using Tracer TU on a PC or laptop computer.
Generate a Chiller Service report from the AdaptView with
Level 4 active.
9