Final Work Steps; Covers; Protective Conductor Resistance Test; Customer Training - Siemens ARCADIS Varic Installation Instructions Manual

Multi-function switch
Hide thumbs Also See for ARCADIS Varic:
Table of Contents

Advertisement

20

Final work steps

Covers

Close all cover panels if any are still open. Make sure the protective conductors make
good contact.

Protective conductor resistance test

Observe the instructions for the protective conductor resistance test in Chapter 1 of
these instructions.
Perform the protective conductor resistance test according to ARTD-002.731.17...

Customer training

NOTE
Explain the functions of the multi-function footswitch to the customer. Also, demon-
strate how to place the footswitch in the holder.
ARCADIS Varic/Orbic
Function check and final work steps
The protective conductor resistance must not exceed 0.2 ohms.
The system operating manual already describes the multi-func-
tion footswitch and its functions.
SPR2-310.812.03.01.02
09.06
Page 20 of 20
CS PS SP
3.1
0
0
0
Siemens AG
Medical Solutions

Advertisement

Table of Contents
loading

This manual is also suitable for:

Arcadis orbic

Table of Contents