Operation

Automatic - Managed

These loads are wired through the PWRmanager and are
configured to run if they do not overload the inverter. If
the total load exceeds the power capacity of the inverter,
these will be shed in priority order to ensure the inverter
continues to run. Loads to configure this way may
include:
Stove, Oven.
Miscellaneous lighting and plug loads.
Heating and Air Conditioning equipment.
Sewage, sump, or water supply pumps.
10
Owner's Manual for Generac PWRmanager 12 Relay Load Controller