Navigation Bar; Controlling Loads In Pwrview - Generac Power Systems PWRmanager Owner's Manual

12 relay load controller
Table of Contents

Advertisement

Operation
Figure 3-3. System Status and Settings
Use the "Configure Circuits" button to directly access the
PWRmanager through the web interface.

Navigation Bar

See
3-4. At the very bottom of the circuits list
Figure
screen is the navigation bar for the PWRview app. Tap on
the other icons on the navigation bar to move to other
screens in the app.
Figure 3-4. PWRview Navigation Bar

Controlling Loads in PWRview

Loads wired through the PWRmanager can be controlled
in the PWRview app. Tap on the "circuits" icon in the nav-
igation bar to see the list of loads. Tap on a circuit bar to
see more detail about it. When the circuit bar is
expanded, the edit icon is exposed (see
Tap on that to make changes to the circuit.
6
Tap on the edit icon and the circuit control panel will
appear.
See
the circuit. Tap one of the unselected radio buttons to
change it. The request will be executed and the panel will
close.
012948
Action
Manual - ON
013795
Manual - OFF
3-5) (A).
Figure
Automatic
Lockout
Automatic
Managed
Owner's Manual for Generac PWRmanager 12 Relay Load Controller
Figure 3-5. Circuit Control Panel Edit Icon
Figure
3-6. It will show the current configuration for
Figure 3-6. Controlling Loads in PWRview
TABLE 3- 1. Controlling Loads in PWRview
Description
Will set the circuit to be "ON" until the
user changes it.
In an outage, if all managed loads and
the Lockout loads have already been
shed, and the inverter is unable to sup-
port the remaining loads, the Manual -
ON loads will also be shed based on
their priority order (lowest to highest pri-
ority).
Will set the circuit to be "OFF" until the
user changes it. Whether grid con-
nected or in an outage, this circuit will
remain "OFF".
Will set the circuit to be "OFF" when an
outage is detected. Circuit will be "ON"
while grid connected.
Will set the circuit to remain "ON" when
an outage is detected. If the inverter
cannot support the load demand, Auto-
matic - Managed circuits will be shed
based on priority order (lowest to high-
est priority). Circuit will be on while grid