Assembly; Installation - Genie GCL-MT Manual

Trolley operator
Hide thumbs Also See for GCL-MT:
Table of Contents

Advertisement

1. Raise the operator and position it so that the drawbar tracks are level and perpendicular to the face of
the door (or the stile where the door bracket will be attached). FIG. 9.
2. Lock the drawbar tracks into the spreader bracket using two 1 /4"-20 x 9/16" track bolts & two lock nuts.
NOTE: Track bolts MUST be installed from inside the track.
3. Secure the operator in position by installing steel angles (not provided) between the ceiling
superstructure and the operator. FIG. 10.
TRACK BOLTS
& LOCK NUTS
WALL
FIG. 9
Section 2: Operator Installation
ROPE, CABLE,
CHAIN, ETC.
LEVEL
DOOR FROM ABOVE
TRACK
INSTALL CARRIAGE BOLTS
UNDER PLATE
90°
FIG. 10
COMPLETED

ASSEMBLY

WALL
Sec-2.8

Advertisement

Table of Contents
loading

Table of Contents